Switchboard

CleanShot 2024-12-19 at 00.27.24@2x

Switchboard

This page provides information as to label requirements fror the for the home switchboard system.

Category

Switchboard

Location

Side of house

Home Switchboard

The Standard required will depend on the type of design and/or installation.

StandardTitleVersion Referenced
AS/NZS 3000Electrical Installations (known as the Wiring Rules)2018 Amendment 1&2
AS/NZS 4777.1Grid connection of energy systems via inverters2024
AS/NZS 5033Installation and safety requirements for photovoltaic (PV) arrays2021
AS/NZS 5139Electrical installations – Safety of battery systems for use with power conversion equipment2019

Application of Labelling

SKU 0032

AS/NZS 5033:2021

Clause 5.4

PV DP Green Reflective Fire Sign

Where a disconnection point is used as the isolation method.

SKU 0033

AS/NZS 5033:2021

Clause 5.4

PV SW Green Reflective Fire Sign

Where a load break  disconnection device is used as the isolation method

SKU 0034

AS/NZS 5033:2021

Clause 5.4

PV AC Green Reflective Fire Sign

For Inverters where the calculated PV d.c. circuit maximum voltage is less than 120V d.c. at the inverter PV input, and the PV modules are within 1.5m of the inverter are installed ie, Micro inverter systems

SKU 0741

AS/NZ5033:2021 Clause 5.7

&

AS/NZ4777.1 2024 Clause 6.2

Shutdown Procedure

Placed adjacent to and visible from the equipment to be operated.  i.e. “INVERTER”.

Where the inverter is adjacent to the switchboard it is directly connected to, the shutdown procedure may be placed in the switchboard.

Where the building has a fire panel, an additional sign shall be placed at the fire panel with instructions as to the location of the IES Emergency shutdown procedure (Refer label below).

 

SKU 0159

AS/NZ5033:2021 Clause 5.7

&

AS/NZ4777.1 2024 Clause 6.2

Warning PV Array DC Isolators Do not De-Energize the PV array

Located under the Shutdown procedure.  Where the energy source is not de-energised when the IES is shutdown. A warning shall be included in the emergency shutdown indicating that isolation of the energy source, by shutting down the inverter and isolating the IES , may not de-energise the energy source and further action may be required.

SKU 0596

AS/NZ4777.1 2024

Clause 6.3(g)

Warning Multiple Supplies Isolate all Supplies before working on this “Switchboard”

Located at the Switchboard in a prominent position on the switchboard and visible to personnel operating the switchboard.

SKU 0721

AS/NZ4777.1 2024

Clause 6.3(b)

Main Switch Grid

Where the inverter is connected to the main switchboard, the main switch for the grid supply shall be labelled Main Switch (GRID)

SKU 0722

AS/NZ4777.1 2024

Clause 6.3(a)

Main Switch (INVERTER)

AS4777.1 2024 6.3 (a) The Main Switch for the IES Supplementary supplies shall be labelled Main Switch (INVERTER)

SKU 0723

AS/NZ4777.1 2024

Clause 6.3(a)

Main Switch Solar (INVERTER)

Where there is more than one IES supplementary supply other wording associated with the energy source may be added to the label eg.

SKU 0723

AS/NZ4777.1 2024

Clause 6.5

Inverter Location

Placed on the Switchboard where the inverter is not within 3 meters and fully visible from the main switchboard / and or fire panel

SKU 0019

AS/NZ5033:2021

Clause 5.6.1.1

&

AS/NZ4777.1 2024

Clause 6.5

Solar Array on Roof V A

Located in switchboard

This label Is not specified in the latest standard, however still used by many,

Now a requirement if included with Solar System Layout. “Site map”

SKU 0022

AS/NZ5033:2021

Clause 5.3.2

Warning Hazardous DC Voltage

Located on any Array junction box containing PV DC Cable terminations.

Does not apply to PV array disconnecting devices as they have their own labelling requirements

SKU 0035

Energy Safe Victoria

Institute of Electrical Inspectors.

Warning This Premise Contains an Electricity Generation System

Located at the Fire indicator panel, Main switchboard and all Switchboards where an IES is directly connected.